Ingram Road Substation and Transmission Project
The Ingram Rd. Substation and Transmission Project involves the construction of a new electric substation and transmission line at 1495 Ingram Rd., San Antonio, TX 78251.
A substation is a local power hub or distribution point for electricity. The new substation site and easements for the transmission line were made available to CPS Energy in support of a new project to service a large customer in the area. Additionally, the new substation is designed to support future growth in the area utilizing CPS Energy’s standard overhead electric system.
Our website will include updates on the project as steps are completed. Also, you may call, write, or e-mail:
CPS Energy
Antonio DeMendonca, MBA, PMP
EDS Project Manager II- Ingram Rd. Substation Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, TX 78215
Office: (210) 353-5318
Mobile: (210) 850-6358
[email protected]